architect: David McCallum
company: DDB design
photos taken by: myself
location: 179 New St Brighton VIC 3186
I visited a site today which had an interesting integration of frames and structural steel. when asked why this was the builder replied that the structural beams were placed in areas where the highest load bearing will occur because the residence also went underground by one level (there was a carpark underneath and a lift shaft had also been constructed. I was unable to get an overall shot as there was a truck in the driveway blocking the overall view (didnt really want to ask them to move :) )
I visited a site today which had an interesting integration of frames and structural steel. when asked why this was the builder replied that the structural beams were placed in areas where the highest load bearing will occur because the residence also went underground by one level (there was a carpark underneath and a lift shaft had also been constructed. I was unable to get an overall shot as there was a truck in the driveway blocking the overall view (didnt really want to ask them to move :) )
No comments:
Post a Comment